interconnect/Bgp Down Flap End
Concludes the diagnostics process.
All steps available in interconnect
Concludes the diagnostics process.
Check if the project and other parameters are valid and vlan attachments are available.
Check if vlan attachments have BGP down state.
Check if any BGP flap events, report error flaps with duration over 60 seconds.
Check if any Cloud Router had maintenance event.
Check if interconnects with BGP down are in maintenance state.