All Steps

All steps available in the runbook by products


CLOUDRUN

CRM

DATAFLOW

DATAPROC

GCE

GCF

GCP

GCPDIAG

GKE

IAM

LB

LOGS

MONITORING

NAT

PUBSUB

VERTEX

VPC

interconnect/Bgp Down Flap End

Concludes the diagnostics process.

interconnect/Bgp Down Flap Start

Check if the project and other parameters are valid and vlan attachments are available.

interconnect/Check Bgp Down

Check if vlan attachments have BGP down state.

interconnect/Check Bgp Flap

Check if any BGP flap events, report error flaps with duration over 60 seconds.

interconnect/Check Cloud Router Maintenance

Check if any Cloud Router had maintenance event.

interconnect/Check Interconnect Maintenance

Check if interconnects with BGP down are in maintenance state.